Transport Minister Ivaylo Moskovski joined the emergency teams of the National Company Railway Infrastructure which examined the rail link passing through the flooded area in Haskovo.
Minister Moskovski got acquainted with the damages in the area between Harmanli and Lyubimets where the steel bridge was flooded. The bridge itself isn’t affected, but parts of the rail line are hanging. The rail line to Harmanli is flooded, filthy and cluttered with debris. Movement from Lyubimets to Svilengrad and from Lyubenovo to Radnevo won’t be restored at least for one month. Movement from Simeonovgrad to Harmanli was restored at 14:30.
|