Ministry of Transport, Information Technology and Communications

Text Version

Skip to Main Content
Home / News

Navigation

Implementing Agencies

The “Short List” of Companies for Building Works Supervision of the Adjoining Infrastructure of the Bridge near Vidin Kalafat, on the Bulgarian Territory Approved


04.05.2007
The "short list" of companies on the contract "Building Works Supervision of the Adjoining Infrastructure of the Bridge near Vidin Kalafat (Bulgaria - Rumania), on the Bulgarian Territory was approved. It was published today, on the Internet page of EC http://ec.europa.eu/europeaid/cgi/frame12.pl.

Participants in the procedure included in the short list are:

1.     GRUSAMAR INGENIERIA Y CONSULTING S.L. (Spain), ELSAMEX S.A. (Spain)

2.     HIGH-POINT RENDEL (UK), INGEROP (France), Salfo and Associates Limited (Greece)

3.     Hyder Consulting Ltd (UK), Acerplan GmbH (Germany), Obermeyer Planen+Beraten GmbH (Germany),

4.     INOCSA Ingenieria S.L. (INOCSA) (Spain), DIWI Consult International GmbH (Germany), ARDANUY Ingenieria S.A. (Spain)

5.     ITALFERR SpA (Italy), Ineco (Spain), Tecnic SpA (Italy)

6.     Parsons Brinckerhoff Ltd (United Kingdom), Rutex (Bulgaria), Tecnica y Proyectos S.A. (TYPSA) (Spain)

7.     Pell Frischmann Consulting Engineers Ltd. (UK), EI Trans Engineering S.P. (Bulgaria)

  • 8. PROINTEC S.A. (Spain), BONIFICA SPA (Italy), SERING INGEGNERIA SRL (Italy)

The final date for submission of the tender documents is June 26, 2007. The offers received will be evaluated, according to the regulations of the European Commission. The expectations are that the contract will be signed in September 2007. With this contract an engineer for independent supervision of the adjoining railway and road infrastructure of the Bridge will be appointed.    

The building works include:

  • Building of electric stand alone railway line with 15 kilometers length, including the electrical network, lighting, distant control system, signalization and telecommunication systems;
  • Building of international Freight Railway station;
  • Reconstruction of the passengers railway station;
  • Building of a road with four roadways with 8 kilometers length;
  • Building of four viaducts on two levels;
  • Building of eight road bridges with openings between one and eleven.

The time for the execution of the contract is 37 months.



Send via e-mail | Print | Up

Current Events

Archive

Home Contact us Sitemap Search site e-Government Send a message RSS
Български English