The deadline for connecting the devices at all technical inspection points to the information system of the Road Administration Agency is 22 July 2024. From then on, the data from the technical measuring devices will be automatically transmitted electronically to the EAAA. After that date, the operation of all points that have not met the conditions will be suspended.
We would like to remind you that in order to improve the quality of technical inspections and increase control, in October 2023 Ordinance No. H-32 was amended to introduce the new requirements. According to the changes it is necessary to install a software approved by the Road Administration Agency, through which the results of the measurements are sent electronically to the Agency at the time of the inspection. So far, 544 out of 1093 stations across the country are now transmitting data automatically.
From 22 April 2024, the Road Administration Authority will only issue permits to new checkpoints if they have already ensured electronic transmission of measurement results to the information system.